Every change detected by the connectors, deduplicated per entity and day, with its source and confidence. Refreshes every minute.
How OG&E balances affordability and surging demand through personalized load shifting.
Lukas Kaluza says rising investment and M&A activity show thermal management is becoming a core infrastructure category for AI-driven data centres
Resurgent NASA has bold plans for Mars, could Rocket Lab also benefit?
Will build initial 100MW of capacity, scaling to 1GW
Currently operates ~12GW
12000 MW planned. Status: announced. Expected 2032.
Krupal Raval joins from CyrusOne
Executives also tease "new agentic AI accelerator"
850 MW planned. Status: announced. Expected 2027.
16 MW.
36 MW.
32 MW.
36 MW.
36 MW.
64 MW.
96 MW.
206 MW.
32 MW.
96 MW.
16 MW.
288 MW.
192 MW.
89 MW.
77 MW.
32 MW.
75 MW.
14 MW.
12.6 MW.
176 MW.
224 MW.
16 MW.
14 MW.
192 MW.
12.6 MW.
36 MW.
36 MW.
Total power changed from 24 MW to 25 MW.
Name changed from "STACK POR03A – Hillsboro" to "STACK POR03B – Hillsboro".
Name changed from "STACK POR03C – Hillsboro" to "STACK POR03D – Hillsboro".
Name changed from "STACK POR03B – Hillsboro" to "STACK POR03C – Hillsboro".
24 MW.
200 MW.
Total power changed from 21 MW to 11 MW.
Name changed from "STACK DFW01B – Plano" to "STACK DFW01C – Plano".
Total power changed from 11 MW to 48 MW.
Name changed from "STACK DFW01A – Plano" to "STACK DFW01B – Plano".
21 MW.
80 MW.
36 MW.