Dated milestones from the sources indexed; partial dates (year, quarter) are shown as published.
STACK strengthens its APAC presence with a cutting-edge development in Johor Bahru
Primary source: stackinfra.com
Location as published; no coordinates yet.
Every field with its source, observation dates, confidence and extraction method.
| Field | Value | Source | Confidence |
|---|---|---|---|
| Announced | Jan 14, 2025 | STACK InfrastructureOperator | Moderate |
| Country | MY | STACK InfrastructureOperator | Moderate |
| Description | STACK strengthens its APAC presence with a cutting-edge development in Johor … | STACK InfrastructureOperator | Moderate |
| Name | STACK Infrastructure Announces 220MW Campus in Malaysia - STACK Infrastructure | STACK InfrastructureOperator | Moderate |
| Operator | STACK Infrastructure | STACK InfrastructureOperator | Moderate |
| Planned power | 220 MW | STACK InfrastructureOperator | Moderate |
| Source Url | https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructu… | STACK InfrastructureOperator | Moderate |
| Status | announced | STACK InfrastructureOperator | Moderate |
Detected events on this project.
When each source was observed, changed or verified.