Dated milestones from the sources indexed; partial dates (year, quarter) are shown as published.
Green Mountain breaks ground on new data centre expansion in London. A new 14 MW expansion is now under construction at our LON-East campus.
Primary source: greenmountain.no
Location as published; no coordinates yet.
Every field with its source, observation dates, confidence and extraction method.
| Field | Value | Source | Confidence |
|---|---|---|---|
| Announced | Dec 8, 2023 | Green MountainOperator | Moderate |
| Country | NO | Green MountainOperator | Moderate |
| Description | Green Mountain breaks ground on new data centre expansion in London. A new 14… | Green MountainOperator | Moderate |
| Name | Green Mountain breaks ground on new data centre expansion in London | Green MountainOperator | Moderate |
| Operator | Green Mountain | Green MountainOperator | Moderate |
| Planned power | 30 MW | Green MountainOperator | Moderate |
| Source Url | https://greenmountain.no/green-mountain-breaks-ground-on-new-data-centre-expa… | Green MountainOperator | Moderate |
| Status | under construction | Green MountainOperator | Moderate |
Detected events on this project.
When each source was observed, changed or verified.