🇺🇸United StatesGrand RapidsUnited States
Also known as Switch PYRAMID, The Pyramid Campus
Designed for up to 1.8 million square feet of data center space and up to 320 megawatts of power, marks Switch’s strategic expansion across the country to serve key markets including Chicago, Ashburn, New York, Washington D.C. and Toronto, all just milliseconds away. The entire campus is powered by 100% green energy.
Address and coordinates — not published by the sources indexed so far.
Carriers, cloud on-ramps and internet exchanges present at this site, as published by the operator or PeeringDB.
Connectivity (carriers, cloud on-ramps, IXPs) — not published by the sources indexed so far.
Every field with the source it was observed on, when, at what confidence and by which method.
| Field | Value | Source | Confidence |
|---|---|---|---|
| Building area | 167,225.5 | SwitchOperator | High |
| City | Grand Rapids | SwitchOperator | High |
| Country | US | SwitchOperator | High |
| Description | Designed for up to 1.8 million square feet of data center space and up to 320… | SwitchOperator | High |
| External Ids | switch slug: pyramid | SwitchOperator | High |
| Name | Switch The Pyramid Campus | SwitchOperator | High |
| Operator | Switch | SwitchOperator | High |
| Operator Id | op utz0a0mbry21 | SwitchOperator | High |
| Planned power | 320 MW | SwitchOperator | High |
| Region | MI | SwitchOperator | High |
| Renewable claim | The entire campus is powered by 100% green energy. | SwitchOperator | High |
| Status | operational | SwitchOperator | High |
| Type | colocation | SwitchOperator | High |
| Website | https://www.switch.com/pyramid | SwitchOperator | High |
Unverified overall — computed from the best source kind and the number of independent primary sources. How confidence is computed
Observations, verifications and detected changes across sources, newest first.
Detected changes to this record — status, capacity, dates, operator.